November 23, 2024

Around the Regions

Bringing the Regions to you

Chiung Mouth to get potable water for Christmas

A section of Chiung Mouth, Potaro-Siparuni (Region Eight)

Residents of Chiung Mouth, Potaro-Siparuni (Region Eight) will soon have access to potable water as the Ministry of Housing and Water plans to dig a $19.3 million well in the community for Christmas.

Minister within the Ministry, Hon. Susan Rodrigues made this announcement yesterday during an outreach to the small, farming village.  The well will be dug in the community for convenience she said, noting that it is yet another demonstration of the PPP/C Government keeping its campaign promise.

“We chose the most critical project that would bring the most impact, that would bring the most benefit and relief to the villagers…The previous well was outside of the community and you had to walk a long distance to get the water. We will drill the well in the community and we will have the distribution network installed,” she said.

The installation of the well will also create jobs in the village.

“We will take care of your water issues and you will help us with individual connections to as many houses as possible,” the Minister said.

Minister within the Ministry of Housing and Water, Hon. Susan Rodrigues

She also assured residents that the project will be done transparently.

Meanwhile, Toshao Euseutact Augustine welcomed the project. He said over the last two years villages depended on water from creeks or harvested rainwater.

“It is long we have been suffering without water. I am glad to have this team providing Chiung Mouth Village with water,” he said.

The contract for the construction of the well was awarded to R. Kissoon Contracting Services. The site for the well has already been identified and preparatory works are expected to start the first week in November.

 

 Over 187 residents of Chiung Mouth, Region eight will soon benefit from potable water running from the taps of their homes after not having for the past two years. This comes on the heels of a promise made by Minister within the Ministry of Housing and Water, Hon. Susan Rodrigues to the residents earlier this year while campaigning.

Keeping a promise made, on Sunday during a meeting with the residents, the Minister announced the construction of $19.3M well for the small farming community. The construction of the well is expected to be completed for Christmas.

Rodrigues told the residents that “the well will now be in the community. I heard the previous well was outside of the community and you had to walk a long distance to get the water. We will drill the well in the community and we will have the distribution network installed.”

Minister Rodrigues said the installation of the distribution network will be done with community participation which will provide much need jobs for the residents.

“We chose the most critical project that would bring the most impact, that would bring the most benefit and relief to the villagers… So once and for all we will take care of your water issues and you will help us with individual connections to as many houses as possible,” Minister Rodrigues stated.

The project the Minister said will be treated with the utmost urgency as she gave residents the assurance they will not be neglected by the government.

Toshao of the community Euseutact Augustine welcomed the project since it will bring the community a lot of relief. He said for the past two years villager depended on water from creeks or harvested water when it rained.

“It is long we have been suffering without water. I am glad to have this team providing Chiung Mouth Village with water,” he stated.

The contract for the construction of the well was awarded to R. Kissoon Contracting Services. Preparatory works are expected to commence the first week in November. The site where the well will be dug has already been identified.

Minister within the Ministry of Housing and Water, Hon. Susan Rodrigues